What you're really paying for in design
We were recently asked whether we could focus on the design and the 3D renders, and keep the working drawings to a bare minimum. It's a fair question, and it gets to the heart of what you're really paying for when you engage a designer.
Anyone can make a facade look good in a render, especially now with AI. An image you scroll past once on Instagram is easy. Designing a home that looks that good, gets approved and can actually be built is something else entirely.
Windwood, a three storey home we designed in Manly, is a good example. The site has a 10 metre frontage, only one way in off the street, and beautiful views out over the bay. To make the most of them, we put the living spaces and main bedroom on the top level, with a patio over the garage at the front. Then came the pool. There was plenty of room out the back, but a pool behind a home that faces a view like that feels anticlimactic. It belonged at the front.
That's where it got tricky. With the garage underneath and only about three and a half metres left beside it, we needed depth for the pool, the pool level with the patio, and a way for people to reach the front door. Our answer was a plunge pool beside the patio, a shallow wet edge running towards the boundary, and a half arched tunnel passing underneath it to the entry. Windwood is being built now, and it's great to see it come to life.
None of that works in isolation. Windwood sits within a traditional character overlay, so the design had to win approval as well. And from the very first idea, you have to know you can carry it through to a set of documentation a builder can read and build from.
Coordination matters just as much. Energy ratings, town planning and engineering should be considered as early as possible, not left to the end. On a difficult solution, we'll often bring the engineer in early to make sure it can be done. Knowing when to bring consultants in, and when to hold off and save our clients money, only comes with experience.
The same goes for builders. Draw, price, build too often ends in blown budgets and value engineering. Wherever we can, we bring a builder on early, because they see real costs every day and can test what a design will take to build.
So yes, good documentation is essential. Cutting it back puts the approval, the build and the responsibility at risk. But the real value is the whole picture: someone who can read the site, find the right solution, know it will work and see it through.
If you're planning a new home or substantial renovation, we'd love to show you what that looks like.


Comments